2025 3 10 Work Session Packet 1
City Council · packet · 206 pages · Descriptive metadata inferred from filename
Extracted text for page 7
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item III B. Approval of I-75 Exit 49 Decatur Pike Corridor Traffic Signal Retiming Plan Proposal Overview The FY 2024-25 approved Capital Improvement Fund budget includes $62,000 for an engineering firm to develop a traffic signal retiming plan for four intersections along the Decatur Pike Corridor. Those intersections are Denso Drive, I -75 North Ramps, I -75 South Ramps, Holiday Drive, and Lee Irwin Road (traffic counts only anticipating a new traffic signal at this location due to expected development). Rather than conduct a lengthy RFP process to obtain another engineering firm, city staff is recommending the city council approve the attached proposal from Kimley Horn Engineers, the firm that prepared the Traffic Safety Action Plan of which this specific project was included which is authorized by TCA 12-4-107. Kimley Horn’s scope of work for this phase includes data collection, signal timing optimization, and field implementation for a fee of $34,600. Phase II, which will be budgeted for and occur during FY 2025- 26, will consist of ordering and installing the needed equipment at an estimated cost of $175,000. A memo from the Public Works Department and Kimley Horn’s proposal are attached. Action to Consider Consensus to move this item to the March 18, 2025 regular meeting to approve the proposal from Kimley Horn Engineers. Affected Departments Public Works 5