Westside Updates Change out of all exterior and interior door cores to match new master series: 12-15,000 Cosmetic fixes in hallways: ceiling tiles/glass/etc.: 5-8,000 New fire panel with new wiring/sensors/smoke detectors/strobes: 150,000 Water fountains to bottle filling stations: 15,000 New HVAC/hot water heater/boiler/cooling tower: 800,000-1,100,000 New roof with TPO surface: 700,000 Outside cosmetic repairs/matching metal panels 10,000 Total: 1,998,000 This does not include any kitchen equipment/fixtures to get it back up and running or any fire code updates since the school was shut down. Example: do we have to sprinkle the building to get it up to code or can we open back up as it is? | am waiting on a response from Chris Perry. We will also need another custodian and will eventually need a maintenance worker. | did not replace Clyde when he retired because we were supposed to only have the two schools, but now that we have three buildings, and enhanced athletic fields that we take care of we will need a third worker or a supervisor who can oversee the program and do maintenance work. There are also no library books, classroom furniture, box lights/interactive boards, cafeteria tables, gym equipment, etc. 45