2025 3 10 Work Session Packet 1
City Council · packet · 206 pages · Descriptive metadata inferred from filename
Extracted text for page 32
Unverified text extraction. Check the original page for numbers, names, and layout.
March 4th, 2025, Page 13 kimley-horn.com 10 Lea Ave, Suite 400, Nashville, TN 37210 615 564 2701 ▪ Progress Review Meetings ▪ Utility Coordination ▪ Right-of-Way Design Services ▪ Right-of-Way Mapping Services ▪ Final Design Services ▪ Utility Coordination (in addition to what is outlined above) ▪ Bid Phase Services ▪ NEPA Document Re-Evaluation ▪ Lighting/Electrical Design Services ▪ Environmental Permitting ▪ No-Rise Studies, CLOMR or LOMR through FEMA ▪ Right-of-Way Acquisition Services ▪ Structural Design Services ▪ Construction Phase Services ▪ Design services should the Project Understanding be modified from the assumptions documented in this Scope of Services ▪ Professional services should the project scope exceed those documented in this Scope of Services ▪ Additional agency coordination efforts ▪ Public involvement activities ▪ Air Quality Analysis ▪ Type I Noise Analysis and/or Noise Technical Report ▪ Conceptual Stage Relocation Plan ▪ Ecology – Threatened and Endangered Species Surveys (including but not limited to Bat Presence or Absence Surveys) ▪ Detailed Floodplain Analysis ▪ Traffic Analysis ▪ Traffic Noise Analysis ▪ Farmland Coordination and Farmland Analysis ▪ Section 4(f) Review and/or Documentation ▪ Section 6(f) Documentation ▪ Demographic, Socioeconomic, Title VI, and/or Environmental Justice Analysis ▪ Phase II Archaeological Surveys and/or Phase III Testing ▪ Phase I or Phase II Environmental Site Assessments and Asbestos Containing Materials Surveys ▪ Attendance at meetings outside of those scoped above ▪ Others as requested by the Client INFORMATION PROVIDED BY CLIENT Kimley-Horn shall be entitled to rely on the completeness and accuracy of all information provided by the Client or the Client’s consultants or representatives. SCHEDULE 29