2025 3 10 Work Session Packet 1
City Council · packet · 206 pages · Descriptive metadata inferred from filename
Extracted text for page 31
Unverified text extraction. Check the original page for numbers, names, and layout.
March 4th, 2025, Page 12 kimley-horn.com 10 Lea Ave, Suite 400, Nashville, TN 37210 615 564 2701 5. Draft TEER document (electronic copy in Adobe PDF format) 6. Final TEER document (electronic copy in Adobe PDF format) Task 4 – Preliminary Design Task 4.1 – Preliminary Design Upon receiving notice to proceed for the PE-NEPA Phase from TDOT and receipt of the survey as stated in Task 2 , Kimley-Horn will prepare a preliminary design in accordance with TDOT’s Roadway Design Guidelines and current City of Athens design standards. The plans will consist of the following sheets: ▪ Title Sheet with Index ▪ Typical Sections – Plan will consist of typical for the proposed streetscape designated by project station. ▪ Proposed Layout – Plan will consist of horizontal location of the proposed roadway improvements, curb lines, and sidewalks. ▪ Grading and Drainage Plan – Plan will show the location of the on-site stormwater drainage pipes and structures; additionally, plan will consist of proposed contour lines and spot elevations. Task 4.2 – Preliminary Engineer’s Opinion of Probable Construction Cost Kimley-Horn staff will prepare an engineer's opinion of the probable construction cost to accompany the preliminary design plans. The opinion of probable construction cost will be based on actual bid prices for recent projects which involved similar equipm ent and construction, to the extent that such information is available. This cost will be based on preliminary construction quantities developed from the preliminary construction plans. The Consultant has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to the Consultant at this time and represent only the Consultant's judgment as a design professional familiar with the construction industry. The Consultant cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Task 4.3 – Preliminary Design Submittal and Review Kimley-Horn will submit preliminary plans to the City of Athens for review and comment. Kimley-Horn will meet with the City to discuss the City’s comments. Following this review meeting, Kimley-Horn will revise the plans based on the City’s comments. Task 4 Kimley-Horn Deliverables: 1. Preliminary Plans package (PDF format) 2. Preliminary engineer’s opinion of probable construction cost (electronic copy, PDF format) to the City Additional Services Any services not specifically provided for in the above scope, as well as any changes in the scope the City requests, will be considered Additional Services and will be performed at our then -current hourly rates or an agreed upon lump sum value. Additional Services Kimley-Horn can provide consist of, but are not limited to, the following: 28