2025 3 10 Work Session Packet 1
City Council · packet · 206 pages · Descriptive metadata inferred from filename
Extracted text for page 26
Unverified text extraction. Check the original page for numbers, names, and layout.
March 4th, 2025, Page 7 kimley-horn.com 10 Lea Ave, Suite 400, Nashville, TN 37210 615 564 2701 Task 3 – National Environmental Policy Act (NEPA) Documentation Given the nature of the proposed project and the assumptions that: 1) federal funding will not be involved in the development of the proposed project and 2) minimal right -of-way and/or easements (permanent or temporary) will be required and will not total at or above one (1) acre and will not warrant any relocations or displacements, the project is a likely candidate for classification as a Tennessee Environmental Evaluation Report (TEER), which conforms to TDOT’s state -funded environmental review process. This determination can only be made, however, by TDOT. If a different level/type of environmental document is required by TDOT other than the preparation of a TEER, this effort will be considered Additional Services beyond this scope of services. One Build Alternative and the No-Build Alternative will be studied. The TEER document will be based on functional plans or on preliminary plans (20-30 percent complete) as defined on Page 4-5 of the TDOT’s Local Government Guidelines for the Management of Federal and State-Funded Transportation Projects (June 2023). Task 3.1 – TEER Project Management and Coordination The purpose of this task is to plan, organize, and implement the tasks associated with the delivery of the TEER review and documentation in a timely manner. In this task, Kimley-Horn (hereinafter, the Consultant) will: ▪ Maintain direct contact and function as a liaison with the designated representative of the TDOT Environmental Division’s NEPA Programs Office, Local Programs Representatives ▪ Provide periodic (up to bi-weekly) updates to the Consultant’s Project Manager Task 3.2 – Environmental Technical Studies As part of the preparation of the TEER, the Consultant will complete the applicable environmental technical studies as outlined below. Ecology As warranted, based on coordination with TDOT, the Consultant’s subconsultant, Terracon, will provide an Environmental Boundaries Report (EBR) in accordance with TDOT standards. As part of the preparation of the EBR, Terracon will perform a jurisdictional waters determination as outlined below: Jurisdictional Waters Determination As part of the preparation of the EBR, if warranted, the Consultant’s subconsultant will provide a Waters of the U.S. Determination (i.e., streams and wetlands) for the project area. In performing the jurisdictional determinations, the 1987 Corps of Engineers Wetlands Delineation Manual and the 2012 Regional Supplement: Eastern Mountains and Piedmont Region, will be closely followed to establish a description of the soils, plants and hydrologic conditions of the project area. The Consultant’s subconsultant will perform the following tasks: ▪ The Consultant’s subconsultant will perform a desktop and field review of the Project area in order to locate potentially jurisdictional waters (wetlands, streams or conveyances) of the US / State. ▪ The proposed alignments will be assessed including up to 50 feet of width beyond the right-of-way. ▪ Onsite channels will be assessed using the State of Tennessee’s hydrologic determination criteria to establish whether each channel is considered a stream or wet weather conveyance. Potential wetland areas will be evaluated using the U.S. Army Corps of Engineers (USACE) criteria, specific to the Corps’ Atlantic and Gulf Coast regional supplement. ▪ Approximate locations of any identified jurisdictional features will be field mapped using GAAS - enabled Global Positioning System (GPS) handheld units with approximate 1-meter accuracy. 23