Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2025 3 10 Work Session Packet 1

City Council · packet · 206 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 17

Unverified text extraction. Check the original page for numbers, names, and layout.

Agenda Item 
 
III C. Award of RFQ 24 -08 for Preliminary Design, Environmental Clearances, and Data 
Collection for Historic Downtown Street Improvements at Five Intersections on Green 
Street 
Overview 
During July 2023, the city applied for a $750,184 Multi -Modal Access Grant from TDOT to 
improve five intersections along Green Street, namely the intersections of Forrest Avenue, Atlantic 
Street, Ingleside Avenue, Eastanallee Avenue, and Sunset Drive. The improvements will include 
sidewalks, bike lanes, pedestrian crossing signals, retime traffic signals, ADA compliance, and 
stormwater facilities. This project was identified in the Traffic Safety Action Plan (2025) prepared 
by Kimley Horn Engineers and the Bike & Pedestrian Master Plan (2023). The city was notified 
during early 2025 that the grant was awarded with the state share being 90% ($675,166) and the 
city share being 10% ($75,018). After conducting an RFQ process, Kimley Horn Engineers is 
recommended to the City Council by the staff review committee to perform this street 
improvement project. Their scope of work for this phase includes preliminary design, 
environmental clearances, survey data, and utility data for a fee of $127,800. Phase II, which will 
be budgeted and occur during FY 2025- 26, will consist of preparing construction documents, 
bidding, and actual construction. 
A memo from the Public Works Department and Kimley Horn’s proposal are attached. 
Action to Consider 
Consensus to move this item to the March 18, 2025 regular meeting to approve the proposal with 
Kimley Horn Engineers. 
Affected Departments 
Public Works 
14