2025 3 10 Work Session Packet 1
City Council · packet · 206 pages · Descriptive metadata inferred from filename
Extracted text for page 10
Unverified text extraction. Check the original page for numbers, names, and layout.
kimley-horn.com 10 Lea Avenue, Suite 400, Nashville, TN 37210 615 564 2701 February 28, 2025 Kevin Helms, ICMA-CM, CMFO Project Manager City of Athens 219 Alford Street Athens, Tennessee 37303 RE: Professional Services Agreement Signal Timing Optimization along SR 30 (Decatur Pike) in the City of Athens Dear Mr. Helms: Kimley-Horn and Associates, Inc. (“Kimley-Horn” or “the Consultant”), is pleased to submit this letter agreement (the “Agreement”) to the City of Athens (“the Client”) for professional consulting services for the above-referenced project. SCOPE OF SERVICES Based on conversations, we understand that the City of Athens wishes to improve traffic operations through the optimization of signal timings at the four (4) signalized intersections mentioned below: 1. SR 30 (Decatur Pike) at Milton Road/Denso Drive 2. SR 30 (Decatur Pike) at I-75 SB Ramps 3. SR 30 (Decatur Pike) at I-75 NB Ramps 4. SR 30 (Decatur Pike) at Holiday Drive 5. SR 30 (Decatur Pike) at Lee Erwin Road – traffic counts only Our Scope of Services, Fee, and Schedule are as follows: Task 1 – Project Management This task will consist of general project management, administrative, and accounting activities for the project. It will further consist of one (1) kick-off meeting with the City of Athens staff and preparing meeting minutes. Task 2 – Data Collection and Field Inventory Task 2.1 – Completed Data Collection Efforts Kimley-Horn will conduct an inventory and assessment of the four (4) existing traffic signals in the City of Athens. The inventory will consist of: Traffic Signal Cabinet Type and Manufacturer and Condition Traffic Signal Controller Type and Manufacturer and Condition Malfunction Management Unit (MMU) / Conflict Monitor Type and Manufacturer and Condition 8