2026 7 21 Regular Session Packet council
City Council · packet · 66 pages · Descriptive metadata inferred from filename
Extracted text for page 18
Machine-read OCR text; verify every number, name, and layout against the original page.
INDIVIDUAL PROJECT ORDER NUMBER 008 Describing a specific agreement between Kimley-Horn and Associates, Inc. (the “Consultant” or “KH"), and River Stone Construction (‘the Client” or “River Stone’) in accordance with the terms of the Master Agreement for Continuing Professional Services dated February 12, 2025, which is incorporated herein by reference. Identification of Project: Project Name: Fox Den Subdivision Offsite Roadway !mprovements — City of Athens, TN KH Project Manager: Adam Driver PROJECT UNDERSTANDING Based on the information provided by the comments received from the Tennessee Department of Transportation (TDOT) and City of Athens on the land disturbance permit (LDP), we understand that offsite roadway impravements are required to address access concerns at the intersection of Congress Parkway at Lee Drive based on the Traffic Impact Study (TIS). There is currently a full access median opening at the subject intersection that is not aligned with Lee Drive. The current recommended roadway improvements at the intersection are as follows: * Congress Parkway — Widen into the existing median to provide a northbound left turn lane with 100 LF of storage and a 100 LF bay taper. Modify the existing median on the north side of the intersection to better align with Lee Drive. e Lee Drive — No improvements are currently required for Lee Drive Comments received from TDOT/City of Athens indicate a desire to shift the median opening to line up with Lee Drive and investigate the need for a left turn lane SCOPE OF SERVICES Kimley-Horn will provide the services specifically set forth below Task 1— TDOT Encroachment Documents Kimley-Horn will prepare one set of documents far median modifications far the scope of work described in the Project Understanding that is within the state route right-of-way. Task 2 ~ Encroachment Permit - TDOT The TDOT plans and supporting documentation will be submitted to TDOT for their review towards obtaining an Encroachment Permit. Landscape and Hardscape Plans are required for work within the right- of-way. Design variance requests are not included in the base scope of services. Lane and sidewalk closure permits and utility permits to be administered by the Contractor The budget for this task consists of the following Kimley-Harn activities: rev 0972024 15