2025 10 13 Work Session Packet
City Council · packet · 150 pages · Descriptive metadata inferred from filename
Extracted text for page 33
Machine-read OCR text; verify every number, name, and layout against the original page.
DRAFT - Preliminary Capital Budget - Scheme A - 4 - Rey. Athens City Hall Remodel - Addition Athens, TN September 8, 2025 Remodel Remodel Area Budget Building Remodel Areas 1 Light 7,141 1,071,150 2 Medium 6,856 1,371,200 3 Heavy 1,359 339,750 4,8 Council/ Court 1,748 611,800 Police Center Addition 8,421 3,999,975 Fire Station Bay Extention 0 0 25,525 7,393,875 Design and Construction Costs Building Construction 5,7 Remodel Construction $ 3,393,900.00 Addition Construction $ 3,999,975.00 Special Building Features 10 Roofing Repair $ 50,000.00 Building Subtotal $ 7,443,875.00 Site Development ll General Site Development $ 150,000.00 12 Front Ramp/ Stairs $ 100,000.00 13 Fire Station Apron Repair $ 50,000.00 Sitework Subtotal $ 300,000.00 Total Construction Costs $ 7,743,875.00 Professional Services 15 Architectural and Engineering @ 7.5% (Allen & Hoshall) $ 580,790.63 16 Topographical Survey - (TBD) $ 15,000.00 17 Geotechincal Engineer/Soils Report - (TBD) $ 10,000.00 18 3rd Party Testing - (TBD) $ 30,000.00 19 Hazardous Material Testing- (TBD) $ 15,000.00 Professional Services Subtotal $ 650,790.63 Design and Construction Subtotal 3 8,394,665.63 Miscellaneous Costs 20 Design Review Fee ( if required and typically owner paid) $ 1,000.00 22 Furniture and Office Equipment $ 100,000.00 14 Construction Contingency Allowance (Owner changes/ hidden cond/etc) 3 400,000.00 Subtotal $ 501,000.00 Total Project Cost ° S$ 8,895,665.63 31