2025 10 13 Work Session Packet
City Council · packet · 150 pages · Descriptive metadata inferred from filename
Extracted text for page 32
Machine-read OCR text; verify every number, name, and layout against the original page.
Budget Estimate Notes — Scheme A-4 (9/8/25) 1. 7 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Light Remodel to include - removal and repair/replacement of existing materials such as damaged wall board, damaged flooring, damaged ceiling elements, wall coverings/ finishes, floor finishes/coverings, ceiling materials and finishes. Also includes replacement of existing equipment and fixtures which serve the same purpose. Medium Remodel to include — (In addition to the elements listed above) reconfiguration of space including the addition doors, walls, windows, existing HVAC, lighting, and electrical systems. Heavy Remodel to include - (In addition to the elements listed above) the reconfiguration of plumbing system elements as well as the extension of HVAC, electrical, plumbing systems and additional equipment installation. Council/ Court remodeling to include — (in addition to the elements listed above) potential structural modification to achieve open span across the space as well as higher level of finishes as appropriate for Court and Council Chambers. Estimate for remodel construction as follows: a. Light -$150/ SF b. Medium - $200/ SF c. Heavy - $250/ SF d. Council/ Court - $350/SF e. Building Addition -$450 - $500/ SF Fire Station Apparatus Bay extension 8 ft. under existing soffit to face of existing fascia. Mechanical system repair/ replacement serving same purpose included in remodeling costs. Potential structural modification to the existing facility as required due to potential long span across Council/ Court room in remodel effort. Estimate to replace all existing windows with double insulating glass on existing City Hall building. Estimate to address areas where HVAC units are replaced and any existing areas of repair. Existing roof to be surveyed by roofing consultant for potential repairs/ alterations. Site development for limited site work grading, drainage, paving on building addition site. Proposed addition is located over existing parking area — minimal water retention anticipated due to existing configuration water run-off. Budget to alter existing front stairs to include handicap accessible ramp in this location. Budget to replace existing apron in front of existing fire station drive area. Construction contingency set between at approx. 4.5%-5% of estimated construction cost. Architectural/ Engineering services set at standard 7 1/2% of estimated construction cost. Topographic survey to include site topography, utilities sizes, locations and inverts and boundary legal survey and road access. Soils geotechnical report for existing site soils strength and building foundation requirements Costs for independent testing for concrete, soils, concrete block, steel, etc. Cost for potential hazardous materials testing. Local review fees if required. The City may potentially reduce or waive these fees. Estimated legal and accounting fees. The City may have access to City services and these may be provided without additional cost. Furniture and office equipment estimate set at $5/ SF. 30