2025 10 13 Work Session Packet
City Council · packet · 150 pages · Descriptive metadata inferred from filename
Extracted text for page 17
Machine-read OCR text; verify every number, name, and layout against the original page.
DRAFT - Preliminary Capital Budget - Scheme A - 4 - Rev. Fut. Training Athens City Hall Remodel - Addition Athens, TN September 16, 2025 Remodel Remodel Area Budget Building Remodel Areas 1 Light 7,142 1,071,300 2 Medium 6,866 1,373,200 3 Heavy 1,636 409,000 4,8 Council/ Court 1,452 508,200 Police Center Addition 6,389 3,034,775 5 Training Shell 895 201,375 24,380 6,597,850 Design and Construction Costs Building Construction 6,7 Remodel Construction $ 3,361,700.00 Addition Construction $ 3,034,775.00 Special Building Features $ 201,375.00 9 Roofing Repair $ 50,000.00 Building Subtotal $ 6,647,850.00 Site Development 10 General Site Development $ 150,000.00 11 Front Ramp/ Stairs $ 100,000.00 12 Fire Station Apron Repair $ $0,000.00 Sitework Subtotal $ 300,000.00 Total Construction Costs $ 6,947,850.00 Professional Services 13 Architectural and Engineering @ 7.5% (Allen & Hoshall) $ 521,089.00 14 Topographical Survey - (TBD) $ 15,000.00 15 Geotechincal Engineer/Soils Report - (TBD) $ 10,000.00 16 3rd Party Testing - (TBD) $ 30,000.00 17 Hazardous Material Testing- (TBD) $ 15,000.00 Professional Services Subtotal $ 591,089.00 Design and Construction Subtotal $ 7,538,939.00 Miscellaneous Costs 18 Design Review Fee ( if required and typically owner paid) $ 1,000.00 19 Furniture and Office Equipment $ 100,000.00 20 Construction Contingency Allowance (Owner changes/ hidden cond/etc) $ 347,393.00 Subtotal $ 448,393.00 Total Project Cost $ 7,987,332.00 15