2025 5 12 Work Session Packet 1
City Council · packet · 155 pages · Descriptive metadata inferred from filename
Extracted text for page 37
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item III B. Selection of an Architect to Design Fire Station #3 Overview The City Council authorized the City Manager to begin planning for the design and future construction of an additional fire station on Elizabeth Street during the January 21, 2025 regular session. Based on that directive, a Request for Qualifications (RFQ 25-06) was prepared during February and distributed on March 6, 2025. On the submittal deadline date of April 3, 2025, 12 responses were received. An evaluation committee of 11 city employees was formed to evaluate all 12 responses. That committee consisted of the C ity Manager, Fire Chief, P roject Manager, Building O fficial, six Firefighters, and the Purchasing Assistant. After evaluating all 12 responses, four were selected to continue in the evaluation process with personal interviews to discuss their qualifications further and answer questions and concerns. Those four architectural firms were Wold Architects & Engineers (Brentwood, TN), MBI (Knoxville, TN), Tinker Ma ( Chattanooga, TN) , and Renaissance Group (Lakeland, TN). On April 23, 2025, the evaluation committee met with each of the four firm s in personal interviews. After the personal interviews were concluded , the evaluation committee selected Wold to design the city’s new Fire Station #3. Wold prepared a standard AIA contract for the council to consider (attached). That contract consists of two phases. Phase I consists of programming, concept planning, cost estimating, and exterior façade rendering for a flat fee of $45,000 and a two-month duration. After the completion and City Council acceptance of Phase I, Phase II will begin and consist of the completion of the design, preparing construction documents, assisting with bidding, and providing construction administration for a fee of 6.5% of the final construction cost and a ten-month duration. As an example, if the new fire station is 10,000 square feet x $700 a square foot to build including site development cost, the total construction cost would be $7,000,000 and the architect fees would be 6.5% of that or $455,000. This cost does not include furniture/fixtures, generator, permit fees, 10% contingency, or annual operational cost. If approved, this construction project would be funded by the Capital Improvement Fund over two fiscal years. Attached is a memo from the Purchasing Assistant . A representative from Wold will attend the May 12, 2025 work session to answer any questions or concerns. Action to Consider Consensus is needed to move this item to the May 20, 2025 regular session for consideration. Affected Departments Fire Department 34