Assumptions 
Existing Curb to remain with additional curb and gutter at Old Riceville Road 
ROW cost to be determined by City 
Sidewalk 5 ft with varying grass buffer. Sidwalk will be 5' offset from Existing EOP 
Project Length approximately 1.4 Miles of Sidewalk/Drives on north side of W Madison Ave 
No Engineering or CEI Cost 
Use TDOT 2024 Avg Unit Prices for non-lump sum options. Lump Sum Engineering Judgement. 
No Stone located under sidewalk 
Included 4 curb ramps at Old Riceville Road at proposed signal 
Retaining wall estimated to be gravity wall with rail 
No Utility Impacts accounted for 
Assumptions 
Existing Curb to remain with additional curb and gutter at Old Riceville Road 
ROW cost to be determined by City. Preliminary review would require additional RR impacts 
10' Multi-Use Path with 5' buffer. 
MUP approx 1.2 Miles on north side of W Madison Ave and approx 960 FT of Sidewalk on Dennis St 
No Engineering or CEI Cost 
Use TOOT 2024 Avg Unit Prices for non-lump sum options. Lump Sum Engineering Judgement. 
No Stone located under sidewalk 
Possible impact to stream at Dennis Street 
Included 4 curb ramps at Old Riceville Road at proposed signal 
No Utility Impacts accounted for 
Retaining wall estimated to be gravity wall with rail 