2025 5 12 Work Session Packet 1
City Council · packet · 155 pages · Descriptive metadata inferred from filename
Extracted text for page 151
Unverified text extraction. Check the original page for numbers, names, and layout.
Assumptions Existing Curb to remain with additional curb and gutter at Old Riceville Road ROW cost to be determined by City Sidewalk 5 ft with varying grass buffer. Sidwalk will be 5' offset from Existing EOP Project Length approximately 1.4 Miles of Sidewalk/Drives on north side of W Madison Ave No Engineering or CEI Cost Use TDOT 2024 Avg Unit Prices for non-lump sum options. Lump Sum Engineering Judgement. No Stone located under sidewalk Included 4 curb ramps at Old Riceville Road at proposed signal Retaining wall estimated to be gravity wall with rail No Utility Impacts accounted for Assumptions Existing Curb to remain with additional curb and gutter at Old Riceville Road ROW cost to be determined by City. Preliminary review would require additional RR impacts 10' Multi-Use Path with 5' buffer. MUP approx 1.2 Miles on north side of W Madison Ave and approx 960 FT of Sidewalk on Dennis St No Engineering or CEI Cost Use TOOT 2024 Avg Unit Prices for non-lump sum options. Lump Sum Engineering Judgement. No Stone located under sidewalk Possible impact to stream at Dennis Street Included 4 curb ramps at Old Riceville Road at proposed signal No Utility Impacts accounted for Retaining wall estimated to be gravity wall with rail 140