2025 5 12 Work Session Packet 1
City Council · packet · 155 pages · Descriptive metadata inferred from filename
Extracted text for page 142
Machine-read OCR text; verify every number, name, and layout against the original page.
Also attached is Allen & Hoshall’s proposal to facilitate a planning process with the City Council and city staff to 1) renovate the existing city hall and 2) construct a detached Public Safety Complex. The outcome of this initial phase would be a conceptual floor plan of departmental configurations, exterior facade renderings, a report on existing building systems and necessary improvements, and probable costs. The cost of this phase is $40,000 and will take about two months to complete. After the completion and acceptance of this phase by the City Council, the second phase, if approved, will consist of completion of the schematic design, design development, construction documents, bidding assistance, and construction administration. The cost of this second phase would be 8% of the construction cost and would take about 18-24 months to complete. The funding source for this project would use a combination of the remaining General Obligation Bond, Series 2021 funds ($1,192,000) and new debt. Below are estimated cost of the expansion and renovation. Action to Consider Consensus is needed to move this item to the May 20, 2025 regular session for consideration. Affected Departments All Revised Estimated Construction Cost Estimated Cost to Construct a Public Safety Complex | Estimated Cost Architect Design Fees Including Programming, Schematic Design, Design | Development, Construction Documents, Civil Engineering, Bidding Assistance, and Construction Administration to Construct a 7,200 S.F. Public Safety Complex L $260,000 Expansion Cost @ $450 per S.F. Including Site Work $3,240,000 | City Permit Fee | $2,000 10% Contingency $324,000 Total Estimated Expansion Cost $3,826,000 L Estimated Cost to Renovate the Existing City Hall ! Estimated Cost Architect Design Fees Including Programming, Schematic Design, Design Development, Construction Documents, Civil Engineering, Bidding Assistance, and Construction Administration to Renovate the Existing 20,000 S.F. City Hall $320,000 Renovation Cost @ $200 per S.F. $4,000,000 | City Permit Fee | $2,000 10% Contingency $400,000 Total Estimated Renovation Costs $4,722,000 | Grand Total Estimated Cost | $8,548,000 132