2023 6 20 City Council Agenda Packet
City Council · packet · 104 pages · Descriptive metadata inferred from filename
Extracted text for page 34
Machine-read OCR text; verify every number, name, and layout against the original page.
Capital Budget Wastewater Division Cash Available for Investment in Plant Capital Expenditures: Replace Truck #44 (2004 F450 Pressure Truck) Replace NMC WW Plant Cart (2016) Articulating Front End Loader 2020 Athens Sewer Improvements (Cedar Sp./Sterling Upgrade PLCs & Controls at Oost. WWTP VT Scada implementation (Oost. & NMC Plants) NMC WWTP UV Bulbs Spare Pump - Mt. Verd Pump Station Biosolids Dryer Conveyors Roof Replacement Oost. Operator's Building Drop Ceiling / LED Lights Oost. Admin Bldg Mtg. Roon Air Compressor/Lights Oost. Maint. Shop Upgrades for CCTV Inspection Truck (software, camera Small Electric Forklift (shared between divisions) Oostanaula WWTP Refurbishment NMC WWTP Refurbishment Admin and Operators Buildings Maint. - Oost. Laboratory Equipment Lift Station Rehabilitation Field and Safety Equipment Collection System Rehab Materia! Donations Technology (SCADA, Computers) Senices Extensions Grinder Pump Core Replacements Manhole Rehabilitation Rehabilitation of Services Excess Cash after Plant Investments 70,000 15,000 95,000 835,937 350,000 250,000 25,000 55,000 250,000 40,000 15,000 10,000 25,000 3,300 150,000 100,000 10,000 15,000 50,000 15,000 500,000 9,000 39,000 500,000 25,000 140,000 20,000 75,000 8,268,899 * Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous 3,679,237 4,589,662 * $2.7 million Inftastructure Project financed with grants and loans over FY23-24 32 Vehicles Capital Projects Continuous 180,000 1,859,237 1,640,000 3,679,237