Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2025 09 08 Work Session Packet

City Council · packet · 130 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 53

Machine-read OCR text; verify every number, name, and layout against the original page.

Survey of Existing Conditions
1.0 Architectural
1.1. Background / Purpose of Study

The existing City Hall Building is a one story building that was originally constructed in 1973. The facility

then had a two story addition constructed more recently, located approximately in northwest corner of the
Fire Department.

This facility has been previously renovated a couple of times to modernize a few departments within the
facility and to provide needed rooms. Within this facility there are the following departments: Public
Common Area, Human Resources, Meeting Rooms, I.T. / Communications, Community Development, Police,
Fire Department, Finance, Parks and Recreation, and Administration. Additionally, there are miscellaneous
rooms to accompany each department such as storage rooms, meeting rooms, break rooms, etc.

This report will concentrate on the assessment of the existing Athens City Hall Facility, with a particular
focus on the feasibility of the Preliminary Plans provided with this study.

Each of these departments are shown on the attached Existing Facility Drawings and the areas for
each portion by department are:

Public Common Area 1,503 SF
Human Resources 543 SF
Administration 1,035 SF
Meeting Rooms 2,808 SF
Finance 2,015 SF
Park and Recreation 725 SF

|.T. / Communications 234 SF

Community Development 1,521 SF
Fire Department 7,517 SF
Police Department 4,186 SF

Each of the departments are shown on the attached existing facility drawings.

an Allen&Hoshall

SNQiNeare-arcAllacig-eruegarg

48