2025 09 08 Work Session Packet
City Council · packet · 130 pages · Descriptive metadata inferred from filename
Extracted text for page 35
Machine-read OCR text; verify every number, name, and layout against the original page.
DRAFT - Preliminary Capital Budget Athens Parks and Rec House Remodel - Paved Lot Athens, TN September 8, 2025 Remodel Remodel Area Budget Building Remodel Areas I Light 909 68,175 2 Medium 1,062 106,200 3 Heavy 187 19,625 2,128 194,000 Design and Construction Costs Building Construction 4 Remodel Construction $ 194,000.00 Special Building Features 5 Re-Roofing $ 4,550.00 6 Replace windows s 12,115.00 7 Garage Door (fiberglass) $ 1,600.00 8 Glass storefront $ 12,600.00 9 Ramp (180 SF @ 350/SF) $ 9,000.00 10 HVAC replacement and Mini-split $ 10,000.00 1l Electric Updates $ 5,000.00 12 Siding $ 3,950.00 13 Exterior Paint $ 2,000.00 14 Front Canopy $ 1,500.00 Patio Canopy $ 1,000.00 15 Patio Repair/ Add $ 2,400.00 Building Subtotal $ 259,715.00 Site Development 16 Parking Lot $ 71,200.00 17 Sidewalks 3 3,100.00 18 Retaining Wall repair $ 8,000.00 Sitework Subtotal $ 82,300.00 Total Construction Costs $ 342,015.00 Professional Services 19 Architectural and Engineering (Allen & Hoshall) $ 41,500.00 20 Topographical Survey - (TBD) $ 3,250.00 21 Geotechincal Engincer/Soils Report - (TBD) $ 7,500.00 22 3rd Party Testing - (TBD) $ 5,000.00 23 Hazardous Material Testing- (TBD) $ 5,000.00 $ Professional Services Subtotal 62,250.00 Design and Construction Subtotal $ 404,265.00 Miscellaneous Costs 24 Design Review Fee ( if required and typically owner paid) $ 1,000.00 25 Furniture and Office Equipment $ 10,000.00 26 Construction Contingency Allowance (Owner changes/ hidden cond/etc) $ 17,000.00 Subtotal $ 28,000.00 Total Project Cost $ 432,265.00