2025 09 08 Work Session Packet
City Council · packet · 130 pages · Descriptive metadata inferred from filename
Extracted text for page 126
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS TO: Randall Dowling, City Manager FROM: Ben Burchfield, Public Works Director DATE: September 4, 2025 SUBJECT: Stormwater Management Program Modifications Background In accordance with our TDEC NPDES Small MS4 permit, the Public Works Department is providing a memo documenting it’s rationale and requesting Council acknowledgement and approval in modification of the stormwater management program. Within the TDEC Small MS4 General Permit, requirements for a small MS4 program to make minor modifications to its program are outlined under section 4.4.1. as follows: 4.4. STORMWATER MANAGEMENT PROGRAM MODIFICATION Program Modification Permittees may modify the Stormwater Management Program during the life of the permit in accordance with the following: 4.4.1.1. Minor Modifications Minor Modification are required to be reported in accordance with 4.2.2. These changes do not require a formal public notice. a) Modifications that add, but neither subtract nor replace, components, controls, or requirements to the Stormwater Management Program may be made by the permittee at any time. A description of the modification shall be included in the subsequent Annual Report. b) Correct typographical errors c) Increase in Monitoring 118