2023 07 18 City Council Meeting Packet
City Council · packet · 63 pages · Descriptive metadata inferred from filename
Extracted text for page 28
Machine-read OCR text; verify every number, name, and layout against the original page.
Matt - See below for some quick take off / estimates for the Ingleside Pickleball overlay. As we discussed yesterday, there would need to be some design decisions made regarding the renovation. We may want to go ahead and fully remove the posts to better access and resurface the whole court area. | included a 5% contingency on all contractor supplied items. | didn't include shade structures (115k), but that can be added if desired and potentially installed in house to save mark up. best, db Clearing/Grubbing - AL $15,000. Typical line item that contractors use for site prep. Clearing/grubbing/mobilization. Site prep which includes removal. Demolition is also a factor. Prep work for making a lay down area to put all of their equipment. Parking lot and sidewalk - $105,000. This has contingency Removal and replacement of sidewalk (access) - 2,900 sf @ 10/sf - $29,000 Fencing (remove / replace approx. 10' perimeter) - 670 If @50/If - $33,500 LED upgrades (both tennis / pickleball) - $125,000. Lighting number from Musco from our original pickleball numbers. If they are only replacing the light fixtures, 4° high fencing - 420 If @ 60 / If - $25,200. Court surfacing (asphalt and sports coating) 27,000 sf @ 6/sf - 162,000. $6/square foot is on the high side but this is a number for contingency. This is to accommodate for any unforeseen circumstances. SUBTOTAL: $494,700 Mobilization (5%) - $24,735 + $494,700 = $519,435.00 By Owner (City of Athens) Benches - 16 @1,500 ea. - $24,000 Nets 12 - @ $2,500 - $30,000 Windscreen - (approx) 850 If @ 20 / If - $17,000 Subtotal: $71,000 +$519,435 = $590,435.00 26