2023 07 18 City Council Meeting Packet
City Council · packet · 63 pages · Descriptive metadata inferred from filename
Extracted text for page 23
Unverified text extraction. Check the original page for numbers, names, and layout.
TO: FROM: Cc: DATE: SUBJECT: Background PUBLIC WORKS Mike Keith, Finance Director/Interim City Manager Kevin L. Helms, Project Manager Ben Burchfield, Public Works Director June 6, 2023 Ingleside Pickleball Project Working with the Recreation Advisory Committee and Lose Design, a concept plan was developed for this project. The plan includes the construction of new pickleball courts, alterations to existing facilities to achieve ADA Compliance, additional parking, new lighting fixtures for the existing tennis courts, and shade structures. These items were divided into several alternates to offer greater flexibility to staff and the City Council in setting priorities while being cognizant of budget funds available. Bids were opened on May 23, 2023, and two bids were received. The bids were from Baseline Sports Construction and Wilson Construction Group with Baseline submitting the low bid. A copy of the bid tabulation is included with this memo. Additionally, a site plan has been included in the packet which color codes the various phases of the project to make it easier to reference what is being constructed with each alternative and its associated cost. The discussion which follows is based upon the low bid. The base bid includes a total of eight pickleball courts and all their needed accessories. It also includes sidewalks to connect the facility to existing infrastructure and upgrades certain areas of existing infrastructure to achieve ADA Compliance. Some grading work during this phase of the project would prep the area where the eight additional courts are designed to be constructed. This is because the topography of the area will have to be changed and by doing it this way, we will minimize the need to haul material offsite. The low bid for the base package is $773,710, plus the City must supply $73,114 in lighting equipment to be purchased through a purchasing cooperative. Alternate #1 includes an extension of the parking lot and sidewalks to serve it. It adds approximately twenty parking spaces, which helps offset a couple we will lose in the existing parking area to achieve ADA compliance. The sidewalks also make a nice connection to other existing sidewalks which are already onsite to improve access to and from the site in multiple directions. This would reduce or eliminate the need for people to park on the grass, which is something that currently happens when the facility is busy. The additional parking would also serve the existing tennis courts, pool, and skatepark. The cost to construct alternate #1 is $87,860. 21