PUBLIC WORKS TO: Bridget Roberts, Interim City Manager FROM: Kevin L. Helms, Project Manager Cc: Ben Burchfield, Public Works Director DATE: August 5, 2026 SUBJECT: Amendment #2 to Professional Services Agreement for STBG-L Paving Project Background When this project was initiated, Gresham Smith (GS) was selected to provide professional engineering services using the standard TDOT consultant selection process. As outlined in the agreement between the City and GS, these services included work performed directly by GS as well as specialized services provided by subconsultants. The original agreement was divided into two phases. Phase I, in the amount of $96,410, covered NEPA, design, and bidding services. Phase II, in the amount of $81,000 , covered Construction Engineering and Inspection (CEI) services. As was previously discussed with City Council during consideration of a budget amendment, construction activities uncovered worse -than-anticipated conditions on Dennis Street . As a result, c onstruction activities were temporarily suspended while additional geotechnical investigations were completed and the construction plans were revised to address the unforeseen conditions. At th at time, City Council approved a budget amendment to cover the additional construction costs related to the revisions. The unforeseen conditions also resulted in increased CEI costs. Although the total amount was not known at the time of the budget amendment, GS has since requested an amendment to its professional services agreement to cover approximately $20,000 in additional CEI costs. Of this amount, $5,570 represents additional geotechnical services performed by GS’s subconsultant. The previously approved budget amendment totaled $115,850, plus a 15% contingency, for a maximum authorized amount of $133,227.50. This funding was in addition to the contractor’s base bid of $1,683,300, which was based on estimated quantities, with final payment to be determined by actual quantities installed during construction. The contractor’s final pay application is currently being processed. Based on current estimates, the final contract amount will be approximately $1,785,000, or approximately $30,000 less than the total amount appropriated to date. 30 Work Session August 10, 2026