2026 1 12 Work Session PACKET
City Council · packet · 40 pages · Descriptive metadata inferred from filename
Extracted text for page 20
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item IV. G. Bid Award for RFP 25 -18 to Renovate Regional Park House into Parks & Recreation Offices. Overview The FY 2025 -26 approved Capital Improvement Fund budget contains $275,000 to prepare renovation plans and renovate the house at Regional Park into Parks & Recreation offices. Design began during July 2025 to renovate the 2,310 sq.ft. house and garage, add an 18-vehicle paved parking area with proper drainage, comply with ADA requirements, replace structurally unsound retaining walls , waterproof the basement , and bring the residential building into compliance with current commercial building codes where required. Additional scope of items not included in the bid is the upgrade of the internet connection and internal security access controls. After the design was completed, bid documents were prepared and distributed. On the deadline date of December 18, 2025, eight bids were received. Three bids were disqualified due to not submitting required documents. Attached are the floor plan, site plan, rendering, bid tabulation sheet, and recommendation of award from the architects, Allen & Hoshall. Based on the acceptable submitted bids, the lowest and most responsive bidder was GCE Construction (LaFollette, TN) with a bid of $816,500 or $353.46 per sq.ft. The architect and apparent qualified low bidder are preparing options to consider to reduce the cost of the project. Those options will be presented at the January 12, 2026 work session. One option could be to combine the lot where the house is with Regional Park in an effort to use existing parking spaces rather than construct 18 new ones saving about $ 150,000 (see attached map). Lastly, some of the approved budget items could be redirected to fund this project including $40,000 to repaint the five blue roofs at Regional Par k, $6,000 to replace the swimming pool slide at I ngleside Park, and $125,000 to conduct repairs at the SE TN Trade & Conference Center for a total of $171,000. As an alternative to this excessive cost, the Parks & Recreation staff of four full-time employees could be located within the SE TN Trade & Conference Center with very minor renovations and using modular “cubicle” furniture as shown in the attached floor plan at an estimated cost of $200,000. Another alternative would be just to have the Parks & Recreation Department remain at city hall and keep the Regional Park house as-is for storage and maintenance crew use. Action to Consider Consensus is needed to move this item to the January 20, 2026 regular session for consideration. Affected Departments Parks & Recreation