2025 2 10 Work Session PACKET 1
City Council · packet · 118 pages · Descriptive metadata inferred from filename
Extracted text for page 70
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS TO: Randall Dowling, City Manager FROM: Kevin L. Helms, Project Manager/Interim Public Works Director Cc: Ben Burchfield, Public Works Director DATE: January 30, 2025 SUBJECT: Rocky Mt. Rd. & W Madison Ave. Railroad Safety Improvements Summary Previously, TDOT , working with the City, undertook a safety evaluation of this intersection which is bifurcated by a grade rail crossing . The primary focus of this study was to assess potential measures to be implemented to improve safety at this location. Following this evaluation, TDOT authorized CSR Engineering who performed the initial evaluation to proceed with design of the safety measures recommended. There are several modifications contained in the proposed design with the primary component being a traffic signal on W Madison Avenue. The project would be funded through Tennessee’s Highway -Railroad Grade Crossing Program which is managed by the Tennessee Office of Rail Engineering. This program is commonly referred to as Section 130 which is the terminology we will use for the project going forward. The State of Tennessee typically receives about $5,000,000 annually from the Federal Highway Administration for this program. The engineer has provided an Opinion of Probable Cost for this project, which is estimated to be $600,000. The Section 130 program will pay for the project in full without any local funding required . The local authority is responsible for administering the project and for maintenance of the infrastructure once the project is complete. The City must initially pay the construction costs and then submit documentation for full reimbursement. Reimbursement requests can be submitted as often as monthly or as infrequently as quarterly. The project has progressed as far as it can without a commitment from the City to move forward with the construction phase. An official commitment to the project will allow for documentation related to the construction phase to progress, but actual construction would not be authorized until the 2026 federal fiscal year which begins October 1, 2025. This documentation includes a contract for the project to be entered into by the State of Tennessee and the City. Once projects are approved by the local jurisdiction, they are placed on a list of statewide projects ready to be funded for construction. 68