Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2024 05 21 City Council Meeting Packet 1

City Council · packet · 89 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 35

Unverified text extraction. Check the original page for numbers, names, and layout.

Page 5 of 10 
kimley-horn.com 10 Lea Avenue, Suite 400, Nashville, TN 37210 615-564-2701 
 
Injury Network, will be included on maps. 
• Develop an online dashboard that summarizes the Comprehensive Safety Action Plan and can 
be updated by the Client in the future as Client maintains and updates crash data and safety 
analysis. 
 
Task 6.2 – Community Walk Audit 
 
Consultant will facilitate community walk audit with the intent of assessing existing roadway conditions, 
pertaining to safety, and identifying challenges and concerns from stakeholders and community 
members. The objective of a community walk audit is for Consultant, Client, and stakeholders to better 
understand site-specific conditions and determine which locations have potential for a future SS4A 
Implementation Grant application. 
Consultant will facilitate up to one (1) community walk audits with stakeholders: 
• Community Walk Audit #1 – Will occur either immediately before or immediately after 
Stakeholder Meeting #1. 
 
Consultant will be responsible for scheduling, facilitating, and providing the appropriate materials and 
content for each community walk audit. 
 
Additional Services 
 
Any services not specifically provided for in the above scope will be billed as additional services and 
performed at our then current hourly rates. 
 
Information Provided By Client 
 
We shall be entitled to rely on the completeness and accuracy of all information provided by the Client 
or the Client’s consultants or representatives. The Client shall provide all information requested by 
Kimley-Horn during the project. 
 
Schedule 
 
We will provide our services as expeditiously as practicable with the goal of meeting a mutually agreed 
upon schedule. 
 
Fee and Expenses 
 
Kimley-Horn will perform the services in Tasks 1-6 for the total lump sum fee below.   Individual task 
amounts are informational only.  All permitting, application, and similar project fees will be paid directly 
by the Client. 
 
Task 1 Project Management      $12,200 
Task 2 Safety Analysis       $26,400 
Task 3 Equity Analysis         $5,700 
Task 4 Development of Recommendations    $15,300 
Task 5 Reporting and Documentation     $16,400 
Task 6 Stakeholder Engagement     $27,900 
 
Total Lump Sum Fee     $103,900 
33