2022 01 18 City Council
City Council · packet · 104 pages · Descriptive metadata inferred from filename
Extracted text for page 46
Unverified text extraction. Check the original page for numbers, names, and layout.
P a g e 13 | 20 timeframe and schedule outlining the NEPA Phase components will be developed. The Consultant will coordinate the NEPA Phase milestones at least once per month either through email or during team meetings with the City. 2.2 Technical Studies The Consultant will initiate, track, complete, and review technical reviews necessary f rom the Preliminary Design Plans provided by Stantec Design Team. First, we will initiate technical studies coordination with TDOT NEPA POC and the appropriate TDOT environmental technical divisions to assist in the determination of what technical studies or desktop reviews are necessary for NEPA compliance. These studies may include: • Noise Impacts • Air Quality • Architectural/Historic Resources • Archaeology and Native American Coordination (Section 106) • Ecology and Natural Resources • Floodplain Impacts • Hazardous Materials • Land Use Review • Farmland (if applicable) • Social and Community Impacts • Conceptual Stage Relocation Plan (TDOT to complete if applicable) • Environmental Justice Analysis • Parks and Recreation Resources • Section 4(f) and 6(f) Resources • Climate Change (if applicable) The NEPA specialist will complete the floodplain impacts, land use review, social and community impact review, environmental justice analysis, parks and recreation review, farmland impacts, and climate change language. Please note that the TDOT NEPA POC will coordinate all project materials and notifications with the TDOT environmental technical divisions, state and federal agencies, and Federal Highway Administration (FHWA). 2.3 Draft Document Preparation The draft NEPA document will be developed consistent with the requirements of the Council of Environmental Quality (CEQ) and using the Federal Highway Administration (FHWA) Technical Advisory, TDOT Environmental Procedures Manual and TDOT Local Programs Manual as guides. The Consultant will incorporate the project Purpose and Need, project description, plans, and results of the technical studies into the appropriate NEPA document template. In addition, we will include tables, figures, and images where appropriate to illustrate and explain the project area characteristics, alternatives, location of impacts, and comparison of impacts. Where appropriate, proposed and/or potential permitting, and mitigation measures will be discussed. Before a draft document is submitted to the City and TDOT, the Consultant will comply with QA/QC standards by conducting an internal review and providing a QA/QC form upon submittal. 2.4 NEPA Public Meeting/Hearing (if applicable) Depending on the level of documentation, or action, and public interest, one NEPA public meeting, or hearing, may be required. If this is applicable, then the Consultant would complete the following tasks: • Reserve Venue 44