2022 01 18 City Council
City Council · packet · 104 pages · Descriptive metadata inferred from filename
Extracted text for page 34
Unverified text extraction. Check the original page for numbers, names, and layout.
P a g e 1 | 20 SCOPE OF SERVICES CITY OF ATHENS PUBLIC WORKS DEPARTMENT RFQ 1716 FUNDING, ENVIRONMENTAL COMPLIANCE, AND ENGINEERING SERVICES FOR TRANSPORTATION IMPROVEMENTS December 23, 2021 OVERVIEW Stantec (the Consultant) has been selected under RFQ 1716 to provide funding guidance, environmental compliance and engineering consulting services related to the implementation and construction of two projects. The projects are both referred to in this proposal and the resulting scope of work as Project A (the City Park Athens City Schools Campus Transportation Improvements, or CTI) and Project B (the Historic Downtown Transportation Alternatives, or HDTA). This proposal defines a standard scope of work for each, following TDOT’s Local Programs Guidelines and standard TDOT project development phases. TDOT’s project Phases are: • Preliminary Engineering-Environmental Only • Preliminary Engineering for Final Design • Right-of-Way (including final plans, bid documents, engineer’s estimate, etc.) • Construction Due to specific factors of each of the two projects, not all the procedures within these Phases are applicable, and this scope of work indicates where a task component may have no work associated with it. In each task, the Consultant has stated any assumptions we have used to determine this scope, recognizing that RFQ 1716 included potentially a wide range of projects. Even though these projects may not pursue State or Federal funding, we have structured our services in a manner consistent with how these would be administered with TDOT management guidance. It is Stantec’s intent that all design activities will be performed in accordance with the following standards and criteria (at a minimum): • TDOT Multi-Modal Design Guidelines • TDOT Roadway Design Manual • TDOT Standard Specifications for Road and Bridge Construction • AASHTO A Policy on Geometric Design of Highways and Streets • AASHTO Roadside Design Guide • Manual on Uniform Traffic Control Devices It is our understanding that for the first project (CTI), the Consultant will provide project management, concept scoping, preliminary design, surveying, right-of-way (if required), construction design, and the necessary permitting 32