PUBLIC WORKS MEMORANDUM TO: C. Seth Sumner, City Manager Mike Keith, Finance Director FROM: Ben Burchfield, Public Works Director DATE: January 5, 2022 SUBJECT: Recommendation to Award Bid for Public Works Building Renovation Project to Integrated Properties, LLC Summary The City received competitive bids for the scope of work outlined for the Public Works Facility Improvements. In total, three bids were received by local/regional contractors. All three bids met the minimum specifications and were evaluated to determine the best and lowest bid. The range between the lowest and highest bid was $42,341 which is very competitive for a project of this size. A ttached to this memo is a recommendation of award prepared by Michel Libel, the project architect with Allen Hoshall. The project cost is higher than the initial ROM estimate of $1,610,093.00 in the facility assessment, which was expected by staff. The 35% cost increase stems from the following factors: 1. Substantial industry-wide construction cost increases 2. Further design investigation identified additional necessary improvements to comply with current building codes. This is common when renovating an older structure 3. Additional temporary structural costs necessary to maintain shop operations during construction 4. Expansion of project scope to include the maintenance shop to address identified deficiencies and layout/reconfiguration changes that need to be completed now to take advantage of cost savings and improve shop safety and efficiency and be OSHA compliant Scope of Work 9