PUBLIC WORKS plans to avoid any cost increases beyond the contingency amount already included in the bid price. However, our greatest concern is regarding the sanitary sewer in the building as most of it is currently non-functional and the pipes are in the slab so the extent to which we could investigate this issue was limited. Therefore, the approximate all-in cost of $3,200,000 for our project is still less than we would anticipate a new facility to cost at today’s prices. Additionally, our project will benefit from having more square footage available in the remodeled facility at a lesser cost than a new facility. The estimated all-in cost includes the building purchase, the base bid, design fees, and approximately $50,000 in various accessory items which will be needed before the building is fully operational. However, it does not include an expense offset in an approximate amount of $285,000 comprised of funds contributed by McMinn County and raised by MRHS. It is important to note this all-in cost includes the building purchase, design fees, hazardous materials survey, asbestos abatement, and some miscellaneous other expenses already incurred. Therefore, the current authorization request is for the base bid amount, plus up to $50,000 in miscellaneous accessories which will be needed for operations, many of which were identified in the bid specifications as to be owner supplied and contractor installed. We developed the recommendation to award the base bid with Alternate #1 should MRHS choose to fund the alternate project based upon all the information outlined above provided Council wishes to keep the project moving forward to meet the original needs identified for this facility. Any other option will result in significant delays and design changes which will not allow the facility to meet all the goals established and, in the end, may not achieve additional savings either. 51