PUBLIC WORKS their role in the project. Additionally, this final rough draft was approved by all parties which allowed us to begin full design plans to be used for bidding the project. In January of 2022, City staff began to focus particularly on kennel design as it had now been determined modular kennels would be the best option for the facility. This process included contacting several kennel! manufacturers to develop specific layout options, construction types, construction timeframe, and cost. Staff was also working on finding a suitable floor covering for the facility. The kennel designs continued to change over time as other information regarding the existing building limitations and areas available for use changed as the overall floorplan evolved. Therefore, the kennels which are to be acquired from Mason Company were one of the last items to be finalized. Once the Public Works Building was demolished, several personnel relocated to the shelter building on a temporary basis. During this time, the City learned the sanitary sewer lines coming out of the building did not work properly. Therefore, it was eventually decided all new lines would be needed rather than installing lines just for newly added facilities. On May 20°, we received what was intended to be a final set of plans to be used for bidding the project. These were distributed to City staff and MRHS representatives for review. The architect wanted to proceed to bidding the same month with the thought we could issue a bid addendum for anything we found during final review which needed to be corrected. Based upon our experience with the Public Works Building where several pieces of contradictory or missing information led to multiple change orders, Ben and | felt a detailed review was needed before we put the project out to bid. We felt a similarly rushed schedule on the Public Works Building bid process was the main contributor to these issues and we did not want to repeat the same mistakes at this facility. While this review was taking place, AH began to assemble the bid specifications book. Our review did indeed identify several similar issues which we corrected before the project was let for bid. After seeing how much more other projects were bidding at compared to the original projected budgets, Ben also took this time to remove any items from the scope which were not deemed necessary as we realized any unnecessary additions would not be financially feasible at this time. Therefore, other than the alternate items included in the bid documents we believe everything else to be the minimum scope necessary to meet the needs of the Animal Shelter operations for both intake and adoption purposes. This information was returned to AH on July 22"4, The requested changes were returned to us in time to have the item placed on the City Council agenda for the August meeting. The floorplan was substantially complete and Council authorized staff to proceed with bidding the project, realizing there could be some minor alterations made throughout the 48