2025 8 19 Work Session Packet website
City Council · packet · 137 pages · Descriptive metadata inferred from filename
Extracted text for page 92
Unverified text extraction. Check the original page for numbers, names, and layout.
Hammerhill Sidewalk Project Tellico Avenue to Towanda Trail Construction Cost Only without surveys, ROW acquisition, engineering, or utility relocations = $500,000 total City Of Athens Opinion ot Probable Construction Cost.1219/2024 Assumptions Unit Cost (TOOT) Concrete Sidewalk (4 ") $ 15.00 Concrete Driveway $ 20.00 Cost - .00 .......... fll1111n IM#M111 . 00 Existing Curb to remain with no additional Curb ROW cost to be determined by City Sidewalk 5 ft with no grass butter. Avg Driveway Length 12 ft (16 drives) (20 ft tie down h) J Curb Ramp I I I I ■- -·-- $ 45.00 = ' ~ rn.oo Proiect Length approxin~ately 2200 LF of Sidewalk/Drives = Earthwork/Drainage Traffic Control EPSC Sub Total 20% Contingency ·-■- -■- $ 15,000.00 $ 5,000.00 TOTAL 0 NoCEI Cost = JW1'iml111 1•11111111 0 Use TOOT 2024 Avg Unit Prices for non-lump sum options. Lump Sum Engineering Judgement. = ' ~ 5,000.00 S 308,935.00 $ 61,787.00 $ 370,722.00 89