PUBLIC WORKS Staff are currently working with the architect to identify options to reduce the overall cost of the project which could provide us with additional contingency in the event it is needed . If additional savings are realized and not needed for additional contingency, the savings will be returned to the fund balance. Summary In addition to the costs discussed above, the city will also incur costs associated with Construction Engineering Inspection services provided by the project architect, Lose Design. This amount is estimated to be $25,000 but will be based upon the actual number of hours required to provide these services. There will also be additional costs associated with specialized testing service s for items such as compaction testing, materials sampling, and Head Injury Criterion testing of the playground safety surface. The estimated cost of the specialized inspections is $15,000. The city will procure these services directly from a vendor and the cost will be based upon the total number of trips and tests required for the scope of work. In addition to the original scope o f work requested in the grant application, the FY26 budget include s $75,000 to pave the remainder of the parking lot, which is outside the limits of disturbance. The total estimated cost to comple te the project is $1,728,336.99. This amount includes site amenities from Bluegrass Recreation, lump sum construction bid from the General Contractor, estimated site amenity installation costs based upon unit prices from the General Contra ctor, estimated cost for CEI , estimated costs for specialized testing, and estimated cost for additional paving. Budgeted funds available for this project are $1,175,000, including $587,500 in LPRF Grant funding. The required grant match from the city is also $587,500 and as mentioned the city also budgeted $75,000 for additional paving. Based upon these estimated revenues and expenditures, the project is approximately $553,336.99 over budget. Approximately $55,000 of the budget overage is due to the decision to add the removal and replacement of the playground to the project scope while offsetting a portion of these costs by reusing four of the six ballfield light poles. However, the exact amount cannot be determined because portions of this work are included in the contractor’s lump sum bid. Originally, the city planned to replace the playground using grant funds from a Blue Cross grant, but after not being funded in two consecutive years the decision was made to add this to the LPRF grant project scope of work. Because the initial budget was prepared in 2020 and the intervening years have had historically high levels of inflation, it isn’t surprising the bids are greater than the original budget. However, the architect provided an Opinion of Probable Cost in September 2024 which was $1,157,616. While I am sure there have been some price increases during the past year, inflation alone would not account for the differential between the bid/proposal amount and the Opinion of Probable Cost, so I asked the architect to provide insight as to why they believe the differential is so large. Their response was as follows: 13