6 No. Program/Cost/Funding Source Responsible Party Status Public Works Department 39 Prepare design and construction drawings to connect and pave View Street using Capital Improvement Funds, $305,000. Public Works Director / Project Manager Proposal from Gresham Smith Engineers to design/prepare construction drawings on July 7, 2025 work session for consideration and approved on July 15, 2025 regular session. NTP issued on July 18, 2025. Will bid with N. Jackson Street paving in late 2025 and completion during Spring 2026. 40 Resurface 9 city streets totaling 3.94 miles using STBG-L funds, $999,000 and Capital Improvement Funds, $1,068,000 for a total of $2,067,000. • Mt. Verd Rd. from Clearwater Rd to city limits (.34) • Sharp Rd. from Velma Rd. to Railroad Ave (.21) • Tellico Ave. from Congress to Astrid St (.83) • Dennis St. from Congress to Decatur Pike (.62) • Woodward Ave. from N. Jackson St. to Ingleside Ave (1.07) • Forrest Ave. from Ingleside Ave. to Madison Ave (.29) • Guille St. from Ingleside Ave. to Eastanallee Ave (.12) • Glendale Ave. from Park St. to Cedar Springs Rd (.29) • Cedar Springs Rd. from Glendale Ave. to Elizabeth St (.17). Public Works Director / Project Manager City Council approved the 9 list of streets during April 2022, Gresham Smith Engineers completed final design/construction drawings and submitted to TDOT for approval. TDOT approved during June, 2025. Bid deadline was July 23, 2025, 3 bids received. On Aug. 11, 2025 work session for consideration and approved on Aug. 19, 2025 regular session. Preconstruction meeting held Sept. 12, 2025. Completion of Mt. Verd Road and Forrest Avenue Nov. 2025, remaining streets anticipated Spring 2026 41 Improve/stabilize/realign N. Jackson St. in front of City Hall using Capital Improvement Funds, $480,000. Public Works Director / Project Manager Gresham Smith Engineers has conducted geotechnical analysis, prepared design plans, and construction cost estimates. Will bid with View Street paving. 42 Have Stancell Electric implement Decatur Pike corridor traffic signal retiming study using Capital Improvement Funds, $193,000. Public Works Director / Project Manager Equipment purchase and installation on Sept. 8 , 2025 work session for consideration and approved on Sept . 16, 2025 regular session . Equipment ordered. 43 Improve the road and railroad intersection of W. Madison, Rocky Mount, and Old Riceville Road using Railroad Grade Crossing Program Grant, $600,000. Public Works Director / Project Manager Design completed. Project contract received and executed by city and TDOT. On bid, bid deadline is Nov. 17, 2025. 44 Prepare an electronic inventory/data base of major city storm water assets of location, size, and condition to determine stormwater needs. Then design and construct needed improvements, $2,503,000 using ARPA grant funds (85% grant/15% local). This study is a precursor to creating a storm water utility. Public Works Director / Project Manager Gresham Smith Engineers has collected all data. Bid opening was Sept. 9, 2025, Bid approved on Sept. 16, 2025 regular session. Project must be completed by Sept. 2026. Precon meeting held Oct. 10, 2025. 138