2025 11 18 City Council Regular Session Packet
City Council · packet · 160 pages · Descriptive metadata inferred from filename
Extracted text for page 110
Machine-read OCR text; verify every number, name, and layout against the original page.
Ki m ley » Horn November 5, 2025, Page 4 Task 2 - 90% Plan Set for Client Review Kimley-Horn will advance the preliminary Plans to a 90% plan set for client review. Task 2.1 Project Management and Progress Meetings This task will consist of project management, administrative, and accounting activities for the project. Coordination activities will consist of preparing and distributing project correspondence, scheduling of meetings, meeting facilitation, and discussion of project elements with the City throughout the process. Monthly invoices and progress reports will be provided as part of this task. Task 2.2 — 90% Civil Engineering Design Kimley-Horn will advance preliminary Civil Engineering Plans to a 90% plan set for client review. Design advancement will be based on client feedback as well as feedback from continued coordination with relevant permitting agencies. Task 2.3 — 90% Stormwater Design Kimley-Horn will advance the preliminary stormwater design and hydrology report to 90% completion including Hydraulic stormwater modeling and including of model results in the Hydrology Report. The stormwater design will be included in grading plans and details. Task 2.4 — 90% Landscape Design Kimley-Horn will advance the preliminary landscape plans to 90% including color-coded landscape plans, species selections, and planning details. Task 2.5 — 90% Electrical and Photometric Plan Kimley-Horn will advance preliminary electrical and photometric plans to 90% for client review. Task 2 Deliverables e 90% Plan Set Including: * Cover Sheet and Project Notes * Demolition Plan = Site Plan * Site Details * Grading Plan * Grading Details = 2-Phase Erosion Control Plan * Erosion Control Details * Utility Plan * Utility Details = Landscape Plan « Landscape Details * Electrical Plan & Photometric Plan * Electrical Details * Hydrology Report kimley-horn.com | 537 Market Street, Suite 202 Chattanooga, TN 37402 423 266 3501 101