2025 11 18 City Council Regular Session Packet
City Council · packet · 160 pages · Descriptive metadata inferred from filename
Extracted text for page 108
Machine-read OCR text; verify every number, name, and layout against the original page.
Ki mley » Horn November 5, 2025, Page 2 SCOPE OF SERVICES Task 1 — Preliminary Design Task 1.1 — Preliminary Project Management and Meetings This task consists of general project management, administrative, and accounting activities for the project. Coordination activities will consist of preparing and distributing project correspondence, scheduling of meetings, meeting facilitation, and discussion of project elements with the City throughout the process. Monthly invoices and progress reports will be provided as part of this task. Task 1.1 Deliverables e Kickoff meeting and site visit e Up to four (4) virtual project coordination meetings e Meeting notes and minutes for each meeting Task 1.2 — Site Survey Kimley-Horn will coordinate with industry partner(s) and provide a site survey including property boundaries, topography, exiting utilities and infrastructure, existing surface conditions, and other site features relevant to project design. Task 1.2 Deliverables e Site Survey in AutoCAD and PDF format Task 1.3 — Geotechnical Evaluation of Subgrade Suitability Kimley-Horn will coordinate with industry partner(s) and provide sampling and testing to determine subgrade suitability for the desired site use. Task 1.3 Deliverables e Geotechnical report with site recommendations. Task 1.4 — Preliminary Permitting Coordination Kimley-Horn will perform preliminary coordination with relevant permitting, jurisdictional, utility and permitting authorities to establish probable permitting requirements for the project. These authorities include but are not limited to the City of Athens, Athens Utility Board (AUB), Tennessee Department of Environment and Conservation (TDEC), and Tennessee Department of Transportation (TDOT). Task 1.4 Deliverables e Written Summary of probable permitting requirements. Task 1.5 — Preliminary Civil Design Kimley-Horn will perform a preliminary Civil Engineering Design for the parking lot layout including site layout, site grading, pavement details, traffic flow pattern, parking lot greenspaces, stormwater kimley-horn.com | 537 Market Street, Suite 202 Chattanooga. TN 37402 423 266 3501 99