2025 4 7 Work Session PACKET 1
City Council · packet · 72 pages · Descriptive metadata inferred from filename
Extracted text for page 44
Unverified text extraction. Check the original page for numbers, names, and layout.
• • • • • • • • • • • • • • • • • • • • • • • • • • Hydrologic and hydraulic modeling Geotechnical services US Army Corps of Engineers Permit City of Athens Permit(s) Additional gravity stormwater services above what is specified herein. Changes to the project layout after the 60% Submittal. Additional permitting beyond what is specified herein. Geotechnical services. Additional survey outside original scope. More than nine (9) site visits during the Construction Phase. Providing construction surveys and staking to enable Contractor to perform its work, and any type of property surveys or related engineering services needed for the transfer of interests in real property; and providing other special field surveys. Providing assistance in responding to the presence of any Constituent of Concern at the Site, in compliance with current Laws and Regulations. Preparing to serve or serving as a consultant or witness for Owner in any litigation, arbitration, or other dispute resolution process related to the Project. Services in connection with work changed irectives and change orders to reflect changes requested by Owner. Additional or extended services during construction made necessary by (i) emergencies or acts of God endangering the Work (advance notice not required). (ii) the presence at the Site of any Constituent of Concern or items of historical or cultural significance, (iii) Work damaged by fire or other caused uring construction, (iv) a significant amount of defective. neglected. or delayed work by Contractor. (v) acceleration of the progress schedule involving services beyond normal working hours, or (vi) default by Contractor. Reviewing a Shop Drawing more than three times, as a result of repeated inadequate submissions by Contractor. Providing the services of a Resident Project Representative to observe and document the work of the Contractor. Preparing a "Final Notice of Acceptability of the Work" or other construction contract close-out documentation. Preparing or assisting Owner in preparing O&M manuals or other Record Documents. Post-construction phase services, including warranty period site visits and providing opinions regarding acceptability of work or corrections needed. Other services performed or turn ished by Engineer not otherwise provided for in this Agreement. Environmental Studies other than that which is listed in Section 1.3. Permitting beyond that which is listed in Section 1.6. Detailed design of Canopy or any Structure. This design will be required to be submitted to Owner for review by the contractor or manufacturer. Engineer will review submittal for general conformance to the contract documents. Renderings Retaining Wall design 10 38 38 38