Hydrologic and hydraulic modeling 
Geotechnical services 
US Army Corps of Engineers Permit 
City of Athens Permit(s) 
Additional gravity stormwater services above what is specified herein. 
Changes to the project layout after the 60% Submittal. 
Additional permitting beyond what is specified herein. 
Geotechnical services. 
Additional survey outside original scope. 
More than nine (9) site visits during the Construction Phase. 
Providing construction surveys and staking to enable Contractor to perform its work, 
and any type of property surveys or related engineering services needed for the transfer 
of interests in real property; and providing other special field surveys. 
Providing assistance in responding to the presence of any Constituent of Concern at the 
Site, in compliance with current Laws and Regulations. 
Preparing to serve or serving as a consultant or witness for Owner in any litigation, 
arbitration, or other dispute resolution process related to the Project. 
Services in connection with work changed irectives and change orders to reflect 
changes requested by Owner. 
Additional or extended services during construction made necessary by (i) emergencies 
or acts of God endangering the Work (advance notice not required). (ii) the presence at 
the Site of any Constituent of Concern or items of historical or cultural significance, (iii) 
Work damaged by fire or other caused uring construction, (iv) a significant amount of 
defective. neglected. or delayed work by Contractor. (v) acceleration of the progress 
schedule involving services beyond normal working hours, or (vi) default by Contractor. 
Reviewing a Shop Drawing more than three times, as a result of repeated inadequate 
submissions by Contractor. 
Providing the services of a Resident Project Representative to observe and document 
the work of the Contractor. 
Preparing a "Final Notice of Acceptability of the Work" or other construction contract 
close-out documentation. 
Preparing or assisting Owner in preparing O&M manuals or other Record Documents. 
Post-construction phase services, including warranty period site visits and providing 
opinions regarding acceptability of work or corrections needed. 
Other services performed or turn ished by Engineer not otherwise provided for in this 
Agreement. 
Environmental Studies other than that which is listed in Section 1.3. 
Permitting beyond that which is listed in Section 1.6. 
Detailed design of Canopy or any Structure. This design will be required to be 
submitted to Owner for review by the contractor or manufacturer. Engineer will review 
submittal for general conformance to the contract documents. 
Renderings 
Retaining Wall design 
10 
38
38
38