2025 4 7 Work Session PACKET 1
City Council · packet · 72 pages · Descriptive metadata inferred from filename
Extracted text for page 39
Unverified text extraction. Check the original page for numbers, names, and layout.
• • • • • • • • • • • • • • • • • • • coordinates of each visible stormwater and sanitary sewer structure within the survey limits. Subconsultant will collect various attributes for each of these structures. The attributes may include but are not Ii m ited to the fol I owing: Horizontal (x, y) location Vertical (z) location (structure) Structure type Pipe shape Pipe size Pipe invert elevation Pipe material t.3.6 Deliverables Survey will be delivered to Engineer in CAD format and a signed & sealed pdf. 1.5 60% Design Submittal a. Prepare construction plans and other items as listed below: Cover Sheet General Notes Sheet(s) Existing Conditions Plan Site Layout Plan Concept Grading Plan(s) Low Flow Channel Stabilization Plan(sl Erosion Control Plan(s) Construction Details(s) b. Prepare draft Technical Specifications. Owner to provide front end (Division 1) documents. c. Prepare an estimate of construction quantities and develop the AACE Class 2 Opinion of Probable Construction Cost (OPCCJ. d. Provide electronic PDF format set of plans to Owner for review and internal coordination. e. Assumed City internal review duration of two (2) days and one round of correlated comments will be provided to Engineer. f. Meet with Owner to discuss review comments on detailed plans, potential easements, special technical specifications outline and OPCC. t. 3. 7 Deliverables 60% design Construction Documents in electronic pdf format. Draft technical specifications in electronic pdf format. AACE Class 2 OPCC in electronic pdf format. 1.6 100% Design Submittal The plans will be prepared in conformance with applicable City of Athens Standards, Policies, and Criteria, etc. Plans will be prepared in a form suitable for advertisement for construction bids. 5 33 33 33