Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2023 09 19 City Council Packet

City Council · packet · 131 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 97

Unverified text extraction. Check the original page for numbers, names, and layout.

Preliminary Design Services: Fee $14,400.00 
1. Roadway
 layout
2. Preliminary drainage
3. Traffic Control concept
4. Plan production
5. Utility coordination
6. Assist Geotech investigation
7. City coordination and review
Construction Design Services Fee $14,805.00 
1. Finalize roadway layout
2. Finalize drainage
3. Tabulated quantities
4. Estimated quantities
5. EPSC plan
6. Sign and striping
7. Final Traffic control plan
8. Plan production
9. City coordination and review
Bidding Services Fee $7,410.00 
1. Bid doc
uments
2. Project specifications using current TDOT specifications and City guidance
3. Assistance answering Requests For Information (RFIs) during bidding.
4. Final bid concurrence
Geotech Services Fee $7850.00 
1. See att
ached scope
TOTAL FEE: $50,855.00 
95