2023 09 19 City Council Packet
City Council · packet · 131 pages · Descriptive metadata inferred from filename
Extracted text for page 80
Unverified text extraction. Check the original page for numbers, names, and layout.
5.5 - Final Deliverables Engineer will incorporate Owner comments into a final SWMP. The following items will constitute the final submittal: 1. Field survey data. 2. GIS Database Report, Statistical System Inventory Report, and CIP/Maintenance Program Report. 3. Complete system model with supporting documentation. 4. SWMP document: Two hard copies and one digital copy. Task 6 - Stormwater Utility Fee Development To assist Owner in establishing a basis for development of an appropriate and reasonable stormwater utility fee, Engineer will provide the services described in this paragraph. 6.1 - Establish Cost of Stormwater System Ownership The total cost to own and maintain the City’s MS 4 stormwater system will be established to be used as a basis for developing proposed fee rates (in Task 6.2) by conducting the following subtasks: 1. Conduct an asset valuation based on information from the City’s GIS database supplemented by field survey conducted under Task 2 of this project 2. Integrate the costs of capital projects recommended in the SWMP under Task 5 of this project 3. Evaluate the MS4 system asset maintenance costs 4. Estimate costs of MS4 permit compliance , including monitoring, reporting, stormwater management planning, etc. 5. Quantify administrative costs, including billing and accounting 6. Incorporate documentation and results of costs evaluation into the fee rate alternatives in Task 6.2 6.2 - Develop Fee Rate Alternatives Up to three alternative fee rate s will be developed for the Owner’s review and consideration by conducting the following subtasks: 78