2023 09 19 City Council Packet
City Council · packet · 131 pages · Descriptive metadata inferred from filename
Extracted text for page 79
Unverified text extraction. Check the original page for numbers, names, and layout.
5.3 - Prioritize Projects Engineer will work with Owner to develop a prioritization protocol customized to Owner’s priorities. Engineer will provide Owner with initial scoring factors for consideration based on scoring protocols used in other master planning efforts and will collaborate with Owner to refine and establish a draft protocol . Once the draft protocol is accepted by Owner, Engineer will score proposed alternatives. Engineer will meet with Owner staff to present OPCCs and prioritization, identify adjustments necessary to the prioritization protocol, if any, and address other comme nts or questions Owner may have regarding the OPCC and prioritization. 5.4 - Draft Stormwater Master Plan The draft SWMP document will be developed to summarize key findings and recommendations from previous tasks. Contents will include the following: • Executive summary; • Results of asset management assessment, including prioritized list of assets to be addressed and recommendations for further investigation, repair / rehabilitation, or replacement; • Prioritized stormwater project list, including a summary of project scoring based on benefits, as well as costs; • Associated figures and mapping to illustrate findings and recommendations; • Fact sheets (see below) to facilitate quick access to stormwater project information to support City CIP planning processes, including OPCCs, benefits, justification, and implementation considerations; • Summary of efforts performed under previous tasks in support of the above recommendations, including data collection and data gap analysis, field survey, asset condition assessment, asset management system geodatabase development; and H&H model development and analyses. Upon completion of the draft report, Engineer will submit three hard copies and one complete digital PDF of the report to Owner for review. 77