2023 09 19 City Council Packet
City Council · packet · 131 pages · Descriptive metadata inferred from filename
Extracted text for page 78
Unverified text extraction. Check the original page for numbers, names, and layout.
m odel will be simulated to evaluate cumulative benefits to stream flow characteristics and water quality issues. 4.7 - Deliverables Engineer will provide a digital copy of the model s to Owner as part of the P roject final deliverables. Task 5 – Stormwater Master Plan 5.1 – Definition of Conceptual Stormwater Projects In this task , Engineer will further define and optimize potential stormwater improvements prior to developing costs and performing prioritization . Improvements may include those evaluated hydraulically in Task 4 and additional related projects to address water quality issues that did not require hydraulic analysis (for example sediment removal). Each project will be evaluated to identify supporting infrastructure needs, refine siting and sizing, and identify permitting requirements. Engineer will meet with Owner to review preliminary project concepts and identify further refinements needed to enhance MS4 compliance, resiliency, or stack objectives with asset management needs. Owner comments will be incorporated and reflected in subsequent SWMP tasks below. 5.2 - Preliminary Opinion of Probable Construction Costs (OPCC) A budget (planning level) OPCC will be computed for potential improvements using recent bid tab information of similar projects and input on the local bid climate from Owner staff. Recent bid tab information, including prices and items as necessary, will be provided to the Engineer by Owner. Engineer will also use its own library of cost data for creation of OPCCs. P reliminary budget costs for improvements will include, at a minimum, the following elements: storm drainage improvements, channel stabilization materials, grading, necessary street improvements/replacements, floodplain benching, water and sewer utility relocations, erosion and sediment control measures, traffic control measures , miscellaneous items (e.g., fencing, walls, etc.), environmental mitigation costs, and easement acquisition estimates as appropriate. 76