2023 09 19 City Council Packet
City Council · packet · 131 pages · Descriptive metadata inferred from filename
Extracted text for page 72
Unverified text extraction. Check the original page for numbers, names, and layout.
• A maximum of 4 bridges will be surveyed. • If additional survey data is needed, Engineer will notify Owner in writing and proceed with additional survey effort only upon receipt of written approval from Owner. Task 3 – Condition Assessment Engineer will coordinate with Owner to establish the methodology and standardized condition assessment process for MS4 network assets to provide consistency in asset evaluation, allowing for accurate prioritization based on their current state and criticality. Engineer will develop and define a condition rating system that can be utilized by city staff to assess the stormwater assets. Engineer will have a staff member work in the field with City staff for two days to perform condition assessments and train City staff on the process. Training will also include instructing City staff on how to update the City’s GIS database with the information collected. 3.1 - General Engineer’s Task 3 services will include the following: • Work with Owner to understand what existing information is available for review to define infrastructure types/numbers. • Define watershed boundary for each project area. • Perform a quality audit of Owner’s existing GIS database, including the structures that comprise the Owner-reported 1,466 pipe segments in the system. • Perform, via subcontract, a topographic survey of stormwater assets to establish and document elevations, dimensions, etc. of key assets. 3.2 – Data Analysis Engineer will coordinate with Owner to develop an asset condition and maintenance rating system for each attribute and protocols for incorporating the asset data and photographs into the City’s GIS database. Attributes and ratings will be developed for the following assets: • Manholes, junction chambers, catch basins, drop inlets, and outlet structures from detention basins; • Pipe inlets, outlets, and headwalls; 70