2023 09 19 City Council Packet
City Council · packet · 131 pages · Descriptive metadata inferred from filename
Extracted text for page 68
Unverified text extraction. Check the original page for numbers, names, and layout.
• A ssist in the production of up to three exhibits utilizing GIS data including but not limited to: streets, buildings, tree lines, drainage system, watershed, and stakeholder questionnaire results if available. • Develop MS PowerPointTM presentation for meetings. • Prepare agenda, sign-in sheets, comment forms, etc. for each meeting. • Facilitate meetings to solicit input from residents, or other interested parties to help answer technical questions. • Prepare meeting minutes, including resident input, and submit for Owner review. • Assist in the creation of up to two break-out stations to facilitate receiving of resident feedback. Task 2 - Data Collection The intent of this task is for Engineer to capture the stormwater utility infrastructure in the study area and use the data for Tasks 3 and 4. This task will be accomplished using a combination of Global Positioning Systems (GPS) data capture and conventional surveying as needed. Engineer’s team includes Robert G. Campbell & Associates, Inc. (“Survey Subconsultant”) for field surveying data collection. Field survey data will be collected and incorporated into the City’s existing geodatabase. The geodatabase design will be updated in collaboration with Owner to determine fields to be included for this Project as well as for subsequent use by Owner. Engineer will provide quality control of Survey Subconsultant data. Engineer will verify select portions of Survey Subconsultant data to verify accuracy and suitability for hydraulic modeling. 2.1 - Field Survey Survey data will be collected as described in this subparagraph. Data collection will be to survey grade accuracy and include the following standards and requirements: 66