Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2023 09 19 City Council Packet

City Council · packet · 131 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 48

Unverified text extraction. Check the original page for numbers, names, and layout.

Page 11
OE-150 & 150T Exhibit A – Engineer’s Services
types listed below. Unless expressly indicated above or in the specific Task Order to be 
included Basic Services, the following services are not included as part of Basic Services and 
will be paid for by Owner as Additional Services, using the basis of compensation for 
Additional Services, as indicated in the specific Task Order.  
1. Preparation of applications and supporting documents (in addition to those furnished 
under Basic Services) for private or governmental grants, loans, or advances in 
connection with the Specific Project; preparation or review of environmental 
assessments and impact statements; review and evaluation of the effects on the design 
requirements for the Specific Project of any such statements and documents prepared 
by others; and assistance in obtaining approvals of authorities having jurisdiction 
over the anticipated environmental impact of the Specific Project.
2. Services to make measured drawings of existing conditions or facilities, to conduct 
tests or investigations of existing conditions or facilities, or to verify the accuracy of 
drawings or other information furnished by Owner or others.
3. Services resulting from significant changes in the scope, extent, or character of the 
portions of the Specific Project designed or specified by Engineer, or the Specific 
Project’s design requirements, including, but not limited to, changes in size, 
complexity, Owner’s schedule, character of construction, or method of financing; 
and revising previously accepted studies, reports, Drawings, Specifications, or 
Construction Contract Documents when such revisions are required by changes in 
Laws and Regulations enacted subsequent to the Effective Date of the Task Order or 
are due to any other causes beyond Engineer’s control.
4. Services resulting from Owner’s request to evaluate additional Study and Report 
Phase alternative solutions beyond those agreed to in Paragraph A1.01.A.1 and 2.
5. Services required as a result of Owner’s providing incomplete or incorrect Specific 
Project information to Engineer.  
6. Providing renderings or models for Owner’s use, including services in support of 
building information modeling or civil integrated management.
7. Undertaking investigations and studies including, but not limited to, detailed 
consideration of operations, maintenance, and overhead expenses; based on the 
engineering and technical aspects of the Project, the preparation of feasibility studies 
(such as those that include projections of output capacity, utility project rates, project 
market demand, or project revenues) and cash flow analyses, provided that such 
services do not include rendering advice regarding municipal financial products or 
the issuance of municipal securities; preparation of appraisals; evaluating processes 
available for licensing, and assisting Owner in obtaining process licensing; detailed 
quantity surveys of materials, equipment, and labor; and audits or inventories 
required in connection with construction performed by Owner.
8. Furnishing services of Consultants for other than Basic Services.
9. Providing data or services of the types described in Exhibit B, when Owner retains  
Engineer to provide such data or services instead of Owner furnishing the same.
10. Providing the following services:  services attributable to more prime construction 
contracts than specified in Paragraph A1.03.C or the specific Task Order; services to 
arrange for performance of construction services for Owner by contractors other than 
the principal prime Contractor, and administering Owner’s contract for such services.
11. Services during out-of-town travel required of Engineer other than for visits to the 
Site or Owner’s office. 
12. Preparing for, coordinating with, participating in and responding to structured 
independent review processes, including, but not limited to, construction 
management, cost estimating, project peer review, value engineering, and 
46