OE-150T - Agreement Between Owner and Engineer for Professional Services – Task Order Edition Page 5 v. SP 07.31.23 J. Surety: Engineer shall not provide or have any responsibility for surety bonding or insurance-related advice, recommendations, counseling, or research, or enforcement of construction insurance or surety bonding requirements. K. Decisions: Engineer shall not be responsible for any decision made regarding the Construction Contract Documents, or any application, interpretation, clarification, or modification of the Construction Contract Documents, other than those made by Engineer or its Consultants. L. Exclusions: Engineer’s services do not include: (1) providing legal advice or representation; (2) serving as a “municipal advisor” for purposes of the registration requirements of Section 975 of the Dodd-Frank Wall Street Reform and Consumer Protection Act (2010) or the municipal advisor registration rules issued by the Securities and Exchange Commission, or (3) advising Owner, or any municipal entity or other person or entity, regarding municipal financial products or the issuance of municipal securities, including advice with respect to the structure, timing, terms, or other similar matters concerning such products or issuances. N. Compliance: While at the Site, Engineer's employees and representatives shall comply with the specific applicable requirements of Contractor's and Owner's safety programs of which Engineer has been informed in writing. 6.02 Design Without Construction Phase Services: For each design performed or furnished, Engineer shall be responsible only for those Construction Phase services expressly required of Engineer in the authorizing Task Order. With the exception of such expressly required services, Engineer shall have no design, Shop Drawing review, or other obligations during construction and Owner assumes all responsibility for the application and interpretation of the Construction Contract Documents, review and response to Contractor claims, Construction Contract administration, processing of Change Orders and submittals, revisions to the Contract Documents during construction, construction observation and review, review of Contractor’s payment applications, and all other necessary Construction Phase engineering and professional services. In such case, Owner waives all claims against the Engineer that may be connected in any way to Construction Phase administrative, engineering or professional services, except for those services tht are expressly required of Engineer in the authorizing Task Order. 6.03 Use of Documents: A. All Documents prepared by Engineer and its Consultants are instruments of service in respect to this Project, and Engineer and its Consultants shall retain an ownership and property interest therein of their respective documents (including the copyright and the right of reuse at their discretion) whether or not the Specific Project is completed. Owner shall not rely in any way on any Document unless it is in printed form and signed or sealed by the Engineer or one of its Consultants. B. If Engineer is required to prepare or furnish Drawings or Specifications under the specific Task Order, then Engineer shall deliver to Owner at least one original printed record version of such Drawings and Specifications, signed and sealed according to applicable Laws and Regulations. C. Owner may make and retain copies of Documents for information and reference in connection with the use of the Documents on the Specific Project. Engineer grants Owner a limited license to use the Documents on the Specific Project, extensions of the Specific Project, and for related uses of the Owner, subject to receipt by Engineer of full payment due and owing for all services relating to preparation of the Documents, and subject to the following limitations: (1) Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Specific Project unless completed by Engineer, or 22