2023 09 19 City Council Packet
City Council · packet · 131 pages · Descriptive metadata inferred from filename
Extracted text for page 19
Unverified text extraction. Check the original page for numbers, names, and layout.
assist auditing existing structures for accuracy with the system. They have allocated $28,000 for these activities and they should be completed by May 2024. 4. Hydrologic and Hydraulic Modeling a. After collection of survey data and 2007 FEMA model data, Gresham Smith will develop a new hydrologic FEMA HEC-RAS model for the City. This model will show real-time stormwater run-off impacts throughout the City based on NOAA 24-hr design storm events. This model is essential to identify or validate critical areas of the MS4 network where there are needs to attenuate and infiltrate stormwater run-off. They have allocated $122,000 to this activity and it should be completed by Sept 2024. 5. Stormwater Masterplan a. After collection and modelling efforts have been completed, Gresham Smith will develop a stormwater masterplan. This plan will holistically assess the City’s existing MS4 system. It will identify areas of concern, area for opportunities, and also provide ranked/ prioritized improvement projects to improve water quality throughout the City, which is a core goal of the City’s MS4 permit. They have allocated $105,000 for this activity and it should be completed by Feb 2025. 6. Stormwater Utility Fee Development a. The City is in dire need of an established MS4 utility fund. Because managing and conveying stormwater requires a “built” environment like other utilities, there needs to be dedicated revenue allocated to maintaining and replacing the system at end-of-life. Based on data collected from the field, Gresham Smith will assist in developing an MS4 utility rate system for residential and non- residential uses. They will develop tiers based on impervious area data sampling from aerial imagery, as well as credit/incentive systems to promote redevelopment and green infrastructure practices to further reduce run- off coefficients and improve water quality. They have allocated $85,000 for this activity, and it should be completed by July 2025. 7. Asset Management/Work Order Platform a. In addition to updating the MS4 asset database, Gresham Smith will also assist the City in implementing an electronic asset management/work order platform to track activities related to MS4 assets. There are two primary platforms the City is interested in, and Gresham Smith will assist in selection and implementation of one of these. They have allocated $13,000 for this activity and it should be completed by Oct 2024. Lastly, there are expected reimbursable expenses to the tune of $22,000, for items such as travel expenses, presentation materials , etc. This brings the total proposal amount to $502,000 for professional services. The Council should also be aware that there are additional activities that Gresham Smith cannot budget for at this time , that will need to be approved at a later date . These include design, bidding, and construction administration costs for one (or more) construction projects that are identified in the masterplan. The grant application has approximately 2 million allocated for capital improvement s (construction costs). Our plan will be to bring a separate proposal for design and construction services to Council to approve once target projects are identified that fit within our budget and timeline constraints. 17