Proposal for Geotechnical Exploration and Design Services  GEOServices Proposal No. 14‐22643 
N. Jackson Street Improvements – Athens, Tennessee December 22, 2022 
3 | Page
 Pavement recommendations for flexible pavement types.
 Unsatisfactory soil conditions and recommended remedial measures.
 Anticipated difficult excavation conditions (if encountered).
 Recommendations for subgrade remediation (if required).
 Recommendations for slope stabilization (if required).
FEES 
Based on the scope of services described above, the cost to perform the geotechnical expl oration will be as 
follows: 
1) Traffic Control (1 day) $2,000 
2) Field Exploration (105 ft with ATV rig) $3,000 
3) Laboratory Testing $   350 
4) Engineering Services $2,500 
Total  $7,850 
Should additional drilling be requested, we can perform this drilling at a cost of $17/foot as long as an extra 
mobilization is not necessary. Traffic control is provided for the drilling process, however, if the City is willing 
to  provide the  traffic control  that  cost  can  be  removed.   Should  conditions  be  enco untered  such  that 
additional  services  appear  to  be  in  the  best  interest  of  the  project,  we  would  contact  you  with  our 
recommendations  prior  to  proceeding  with  any  services  beyond  the  scope of  this  proposal.  We  will  not 
exceed this proposal amount without written authorization from you. 
PROJECT SCHEDULE 
Based on our current sche
dule, we are prepared to initiate our geotechnical services immediately upon 
receipt  of  your  written  authorization  to  proceed,  with  mobilization  to  the  project  site  within 
approximately two to three weeks. Per Tennessee law,  a three‐day utility clearance period is required 
before any excavation or drilling can begin. Tenn essee One Call will provide location of public utilities; 
any  private  utility  location  will  be  the  responsibility  of  the  owner.  We  anticipate  that  the  field 
exploration will be completed in one working day. Verbal preliminary information can be provided at the 
completion of the field work, if necessary. The subsurface report will be submitted approxi mately seven 
to ten working days after the completion of the field exploration (to allow for lab testing completion).  