Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2023 09 19 City Council Packet

City Council · packet · 131 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 100

Unverified text extraction. Check the original page for numbers, names, and layout.

Proposal for Geotechnical Exploration and Design Services  GEOServices Proposal No. 14‐22643 
N. Jackson Street Improvements – Athens, Tennessee December 22, 2022 
2 | Page
GEOTECHNICAL SERVICES 
We propose to explore the site subsurf
ace conditions with three (3) borings. Two of the borings will be 
performed at the crest of the existing slope and one boring will be performed at the toe of the slope.  
The  two  borings  located  at  the  crest  of  the  slope  will  be  extended  to  a  depth  of  40  feet,  or  to  a uger 
refusal, whichever occurs first.  The boring located at the toe of the slope will be extended to a depth of 
25 feet, or to auger refusal, whichever occurs first. The maximum total drilling footage is estimated as 
105 linear feet. Standard penetra tion resistance tests (SPT) will be performed at 2.5 feet intervals in the 
upper 10 feet and then at 5 feet intervals to the termination depth.  Additionally, rock coring will not be 
included as part of this exploration.  The  borings will be backfilled with soil cuttings prior to leaving the 
site. 
All  soil  samples  will  be  retu
rned  to  our  laboratory  where  they  will  be  reviewed  by  a  member  of  our 
professional staff to visually classify the soils and to select representative samples for testing. Laboratory 
testing of selected soil samples will include natural moisture content determinations, Atterberg limits tests 
and unconfined compressive
 strength testing.  
Our services will culminate with a written preliminary report prepared by a geotechnical engineer or project 
staff professional under the review of a senior engineer licensed in Tennessee. The report will provide the 
following: 
 All  field  data  required to  be  recorded  according  to  the  ASTM  standard s  or  other  standard  test
methods employed shall be obtained, recorded in the field and documented in the report.
 All soil shall be classified based on field data, laboratory tests, and other standard test methods
by  the  Geotechnical  Engineer  of  record.   Including  a  chart  illustrating  the  soil  classification
criteria and the terminolog y and symbols used on the boring logs.
 Boring logs showing vertical sections of each boring plotted and graphically presented showing
boring number.
 A description of the existing surface conditions and summary of the subsurface conditions.
 The visual classification of soils according to the Unified Soil Classification System and id entified
with the appropriate letter symbol for all soil strata identified in the boring logs.
 The  soil  nature  and  origin,  including  changes  resulting  from  man’s  activities  and  stream
erosion/deposition.
 Recommendations  for  soil  related  construction  conditions  such  as  site  preparation,  fill
construction, excavation slopes and ground water control.
 Earthwork  construction
  criteria,  including  the  suitability  of  cut  soils  for  reuse  as  fill,  subgrade
inspection and stabilization and fill compaction criteria.
98