2026 3 17 Regular Session Packet City Council
City Council · packet · 65 pages · Descriptive metadata inferred from filename
Extracted text for page 56
Unverified text extraction. Check the original page for numbers, names, and layout.
6 No. Program/Cost/Funding Source Responsible Party Status Police Department 35 Acquire five new police vehicles using Fleet Management Funds, $400,000. Police Chief On July 7, 2025 work session for consideration and approved on July 15, 2025 regular session. 4 vehicles delivered and in service, waiting for delivery of the other 1. 36 Acquire the equipment needed for the five new police cars ($80,000) and acquire new in -vehicle printers ($24,000). Police Chief See #34 above. 37 Acquire 360-degree crime scene scanner using Drug Funds, $18,000. Police Chief Completed. 38 Determine feasibility of constructing a firing range or having a contract with the local gun club’s range. Police Chief Under consideration. Public Works Department 39 Prepare design and construction drawings to connect and pave View Street using Capital Improvement Funds, $305,000. Public Works Director / Project Manager Proposal from Gresham Smith Engineers to design/prepare construction drawings on July 7, 2025 work session for consideration and approved on July 15, 2025 regular session. NTP issued on July 18, 2025. Will bid with N. Jackson Street paving in March 2026 and completion during Spring 2026. 40 Resurface 9 city streets totaling 3.94 miles using STBG-L funds, $999,000 and Capital Improvement Funds, $1,068,000 for a total of $2,067,000. • Mt. Verd Rd. from Clearwater Rd to city limits (.34) Completed. • Sharp Rd. from Velma Rd. to Railroad Ave (.21) • Tellico Ave. from Congress to Astrid St (.83) • Dennis St. from Congress to Decatur Pike (.62) • Woodward Ave. from N. Jackson St. to Ingleside Ave (1.07) • Forrest Ave. from Ingleside Ave. to Madison Ave (.29) • Guille St. from Ingleside Ave. to Eastanallee Ave (.12) • Glendale Ave. from Park St. to Cedar Springs Rd (.29) • Cedar Springs Rd. from Glendale Ave. to Elizabeth St (.17). Public Works Director / Project Manager City Council approved the 9 list of streets during April 2022, Gresham Smith Engineers completed final design/construction drawings and submitted to TDOT for approval. TDOT approved during June, 2025. Bid deadline was July 23, 2025, 3 bids received. On Aug. 11, 2025 work session for consideration and approved on Aug. 19, 2025 regular session. Preconstruction meeting held Sept. 12, 2025. Mt. Verd Road completed. Remaining streets completion Spring 2026. 41 Improve/stabilize/realign N. Jackson St. in front of City Hall using Capital Improvement Funds, $480,000. Public Works Director / Project Manager Gresham Smith Engineers has conducted geotechnical analysis, prepared design plans, and construction cost estimates. Will bid with View Street paving in March 2026. 42 Have Stancell Electric implement Decatur Pike corridor traffic signal retiming study using Capital Improvement Funds, $193,000. Public Works Director / Project Manager Equipment purchase and installation on Sept. 8 , 2025 work session for consideration and approved on Sept . 16, 2025 regular session. Completed. 50