2025 5 20 Regular Session Packet 1
City Council · packet · 210 pages · Descriptive metadata inferred from filename
Extracted text for page 165
Unverified text extraction. Check the original page for numbers, names, and layout.
PU BLIC WORKS T O: Randy Dowling, City Manager FROM: Ben Burchfield, Public Works Director DATE: December 27, 2024 SUBJECT: Crestway Dr & S Matlock S Intersection Study Update BA CKGROUND E arlier this year in September 2024 an accident occurred involving two motor vehicles and multiple injuries at the intersection of Crestway Dr and S Matlock Ave . There was considerable public discussion and concern over the incident as well as the broader safety concerns of the intersection. Public Works investigated the intersection immediately following the incident and proceeded to complete multiple low- cost improvements to enhance safet y in an effort to be p roactive. Improvements included vegetation removal to increase intersection sight distance, addition of advance stop notification signage f or EB vehicles on Crestway Dr and refreshing thermoplastic stop bars at the intersection. Based on the MVA report, these items were not precipitating causes to the accident, excess speed and failure to yield were the root cause of the incident. D espite this, Public Works was requested to perform additional study of the intersection of Crestway Dr and S Matlock Ave to see if further enhancements are warranted; more specifically, modification of the intersection from a 2-way stop controlled intersection to a 4-way stop controlled intersection. ME THODOLOGY T here is a standardized process for evaluating intersections for this outlined in the Manual of Uniform Traffic Control Devices (MUTCD) . Intersection Rights-of-Way, generally, are governed by Section 2B.04. Multi-Way Stop Applications, which is more specific and relates directly to this request, are covered under Section 2B.07, hereunder incorporated for reference: 155