Hammerhill Sidewalk Project Tellico Avenue to Towanda Trail Construction Cost Only without surveys, ROW acquisition, engineering, or utility relocations = $500,000 total City Of Athens Opinion of Probable Construction Cost. 12/9/2024 Assumptions i Quantity =— Existing Curb to remain with no additional Curb Rea 10800 15.00 162,000.00 | ROW cost to be determined by City 3840 20,00 76,800.00 | Sidewalk 5 ftwith no grass buffer. Avg Driveway Length 12 ft(16 drives) (20 ft tie down ft Curb Ramp |Each| 3 45.00 3 139.00 | Project Lensth approximately 2200 LF of Sidewalk/Drives Earthwor/Drainage Ena 50,000.00 | § 50,000.00 | NoCEI Cos Tra‘fic Control 19,000.00 15,000.00 | Use TDOT 2024 Avg Unit Prices for non-lump sum options. Lump Sum Engineering Judgement. EPSC = §,000.00 : 6,000.00 (eI! Se ae 1 ET moe Cae 90